Field Installation and Commissioning

Engineering Services

Field Installation and Commissioning

On-Site Installation and Controlled Commissioning

At Bross Otomasyon, on-site installation and commissioning are planned according to approved drawings, the work schedule, work permits, and facility safety rules. Panel locations, cable routes, connections, and labels are checked against site documentation.

Mechanical and electrical checks are completed before voltage is applied; the system is energized in stages, in the sequence defined by the acceptance plan. Protection and control circuits, interlocks, alarms, and any communication interfaces are verified against the project scenarios.

Measurement and test records are prepared as required by the scope. Operating information is provided to the operations and maintenance teams, and current drawings, outstanding items, and handover conditions are finalized with the customer.

Let's discuss your site project
Electrical panel installation and field commissioning Electrical panel installation and field commissioning

Systems commissioned with confidence

Installation and commissioning are among the highest-risk phases of a project. Work starts with de-energized checklists, continues with staged energization and measurements under load. The system is not handed over until operator training and the handover package are complete.

Scope

  • De-energized inspection and wiring verification
  • Staged energization and measurement records
  • Functional tests and protection-setting verification
  • Operator training and handover documentation
Field installation and commissioning work
+150 Panels commissioned
%100 Functional testing coverage
24/7 Technical support line

Every hour on site is planned to reduce facility downtime. The steps below show how we structure this process.

Planned installation, uninterrupted operations
Planned installation, uninterrupted operations

Installation

Planned installation, uninterrupted operations

The installation work schedule is prepared together with the facility's production schedule. Steps requiring a power interruption are announced in advance and completed within the shortest feasible window.

  • De-energised work checklists
  • Stepwise energisation
  • Cable and label verification
  • Site safety measures
A system verified under load
A system verified under load

Commissioning

A system verified under load

After functional tests, the system is loaded step by step and protection settings are verified by measurement. Before handover, the operator team is trained using real scenarios.

  • Functional and load tests
  • Verification of protection settings
  • Operator training
  • Handover package and maintenance plan

After handover

Commissioning is a process, not a date

When the panel is energized, the work is not finished. Measurement records, a trained operations team, and a maintenance plan are among the facility's most important needs in the first months after handover.

Facility verified by measurement

Measurements are recorded at every stage; the system is not handed over until protection settings have been verified.

Trained operations team

Operators and maintenance staff train with real scenarios, including alarm management and basic maintenance on site.

Post-handover follow-up

Measurement records are reviewed during the first months; protection settings and alarm thresholds are updated when needed.

How We Work On Site

1

De-energized checks

Wiring, labeling, and earthing are verified against a checklist before voltage is applied.

2

Staged energization

The system is energized in stages; measurements are taken and recorded at each stage.

3

Functional and load testing

Protection settings are verified by measurement, and the system is tested under real load.

4

Training and handover

The operations team is trained; diagrams, test forms, and the maintenance plan are included in the handover package.

Planned, traceable installation on site

Installation follows the approved project and occupational-safety plan.

  • Panel positioning and fixing

  • Cable pulling and wiring

  • Labelling and checklists

Kapsam

  • Panel and cabinet installation
  • Cable pulling and wiring
  • Occupational-safety plan
Planned, traceable installation on site

Commissioning step by step

Commissioning starts with a checklist completed before voltage is applied.

The system is then energised in stages, functionally tested and measured under load.

Kapsam

  • De-energised checklist
  • Stepwise energisation
  • Testing and measurement under load
Commissioning step by step

Training is part of handover

After commissioning, the operations team receives training on the panel, protection settings and alarm management.

The handover package includes diagrams, test forms and maintenance recommendations.

Kapsam

  • Operator training
  • Handover package
  • Maintenance recommendations
Training is part of handover

Acceptance steps follow the project plan

Post-installation inspections, tests and site-acceptance steps are completed according to the acceptance plan agreed with the customer. Measurement and functional results are recorded within the agreed scope.

Kapsam

  • Verify site connections
  • Protection and control functions
  • Measurement and test records
  • Track open items and handover conditions
Acceptance steps follow the project plan

Handover with current drawings and records

Changes made on site are incorporated into current project documents. Handover-package contents are defined by the panel list, commissioning work and contract deliverables.

Kapsam

  • Current diagrams and connection information
  • Functional-test results
  • User-briefing records
  • Maintenance and follow-up recommendations
Handover with current drawings and records

Frequently Asked Questions:

When is commissioning carried out?

It takes place after installation and wiring checks are complete, during an outage window approved by the operator. Planning is done together before installation starts.

Do you provide operator training?

Yes. After commissioning, we provide practical training for operations and maintenance teams on panel use, alarm management and basic maintenance.

Is maintenance support available after commissioning?

On request, we provide a maintenance plan including periodic maintenance, thermal measurement and checks of protection settings.

What steps can field commissioning include?

According to the project and acceptance plan, the scope may include de-energised checks, stepwise energisation, verification of protection and control functions, and preparation of required records.

What preparations are needed before commissioning?

Approved drawings, panel and site connection lists, work permits, the outage window and named operations contacts support planning. Requirements are confirmed against site conditions.

Are test results and current drawings handed over?

Test records, revised drawings and user-briefing documents are prepared according to the document list defined in the project acceptance plan and contract.

On site

Let's plan commissioning together

Share the site conditions, outage window, and test criteria; we will plan the installation and commissioning scope step by step.

PROJECT DISCUSSION

Let's review your project together.

Share your needs and contact information. Our team will get in touch to assess an engineering and manufacturing approach suited to your project.