HVAC and Industrial Cooling

Sectors

HVAC and Industrial Cooling

Power supply, control and automation panels for HVAC and industrial cooling systems.

Safe starting for chiller and pump groups
Safe starting for chiller and pump groups

Power supply

Safe starting for chiller and pump groups

Electrical characteristics of compressor, pump and fan motors are reviewed with starting current, operating regime and manufacturer data. Cables, busbars and protection devices are selected using these data and the applicable technical specification.

  • Chiller and cooling-group supply panels
  • Compressor and pump motor circuits
  • Drive or soft-starter interfaces
  • Protection coordination and energy measurement
Equipment control linked to BMS through defined interfaces
Equipment control linked to BMS through defined interfaces

Control and building systems

Equipment control linked to BMS through defined interfaces

Temperature, pressure and operating-status signals are brought into the control panel according to the project I/O list. For BMS or SCADA connections, the communications protocol, alarm points and command permissions are agreed with the existing system.

  • Chiller, pump and cooling-tower control interfaces
  • Staged operation and interlocking scenarios
  • BMS/SCADA point list and communications
  • Alarm, status and measurement screens
Each operating mode verified on site

Testing and commissioning

Each operating mode verified on site

After panel and site connections are checked, automatic, manual and fault scenarios are tested according to project scope. Operating sequences, alarm thresholds and BMS communications are verified with the operations team.

  • I/O and field-signal tests
  • Motor direction and protection checks
  • Automatic-operation and alarm scenarios
  • Test forms and operator briefing
Reliable operation of cooling systems depends on considering equipment data, motor protection, and control scenarios together.
  • Chiller power supply panels
  • Pump and boiler control panels
  • Drive and soft-starter applications
  • BMS integration
  • Energy measurement
  • Site commissioning

From the Field

Three Design Priorities for Cooling Systems

We address power supply for chiller, pump, and fan units together with their automation interfaces, according to project requirements.

Contact Us

Starting Current

The soft starter or drive is selected according to the motor and compressor starting requirements.

BMS Compatibility

The panel communicates with the building automation system using the same protocol; the point list is prepared together.

Monitoring and Alarms

Temperature, pressure, and power values are monitored; thresholds are defined with the operations team.

How Does an HVAC Panel Project Progress?

1

Equipment and Load Analysis

Motor data, cooling units, and operating scenarios are verified against documents and site conditions.

2

Power Supply and Control Design

Protection, motor control, and BMS/SCADA connections are arranged according to the approved I/O list.

3

Manufacturing and Testing

Panels are manufactured according to the approved design; electrical and functional checks within the scope are recorded.

4

Site Commissioning

Signals, operating sequence, alarms, and any BMS communications are verified according to the acceptance plan.

HVAC and Industrial Cooling Frequently Asked Questions

Can cooling groups be started in stages?

Yes. Staged operation according to load demand is configured in the control panel together with temperature and pressure monitoring.

Is integration with an existing BMS possible?

The communication protocol is selected for the existing system; integration based on Modbus, Profibus or Ethernet can be provided.

How is energy consumption monitored?

Measurement can be performed by group and equipment; data can be transferred to an energy-management system or SCADA for reporting.

Can drives be used on chiller compressors?

A drive solution can be assessed if the operating range permitted by the motor and chiller manufacturers, load profile and control method are suitable. Selection is verified against equipment documents and project specification.

Can temperature and pressure signals be connected to the control panel?

Yes. Sensor type, I/O list and signal range are determined by project documents; measurement and alarm points can be matched with BMS/SCADA interfaces.

Can pumps and cooling groups be operated in sequence?

Staged or redundant operating logic can be implemented in the control panel according to equipment-manufacturer limits and process requirements.

How is the communications protocol selected for BMS integration?

The protocol supported by the existing BMS, point list and access rules are reviewed at project start. The interface and test method are determined with the integration parties.

What is tested when an HVAC control panel is commissioned?

Field signals, motor protection, operating sequence, alarm thresholds and, if present, BMS communications are verified against acceptance-plan scenarios.

Which documents are needed when requesting a chiller-panel quote?

Chiller and motor lists, manufacturer electrical diagrams, power and starting data, control scenarios, BMS point list and site information help prepare a quote.

Industry

Power and Control for Your Cooling Units

Share your chiller, pump, and BMS information so we can plan the scope of the power supply, drive, and control panels together.

PROJECT DISCUSSION

Let's review your project together.

Share your needs and contact information. Our team will get in touch to assess an engineering and manufacturing approach suited to your project.