Engineering Services
Panel Design and Manufacturing
Control Panel Manufacturing, from Design through Testing and Delivery
At Bross Otomasyon, low-voltage distribution, control, and automation panels are manufactured based on approved designs, bills of materials, and the customer's technical specification. Panel dimensions, entry and exit directions, installation area, and field connection requirements are clarified before production begins.
Mechanical assembly, busbar processing and installation, device layout, and cable preparation and termination are carried out in line with project drawings. Labeling, cable numbering, terminal arrangement, ventilation, and maintenance access are also considered to support panel operation.
In-process inspections and pre-shipment tests are performed according to the contract and acceptance plan. The customer and our team agree on the handover scope for current drawings, equipment information, and test records.
- Sheet-metal processing, painting and assembly
- Busbar manufacturing and wiring
- Heat-load and ventilation calculation
- Labelling and cable numbering
- Use of type-tested components
- In-process and final inspection
- Factory acceptance test (FAT)
- Delivery package and certificates
Service Scope
- Sheet-metal processing, coating and assembly
- Busbar manufacturing and wiring
- Use of type-tested components
- Thermal management and ventilation
- In-process and final inspection
- Factory acceptance testing
A modular, serviceable panel
Panel design considers ease of maintenance as well as ease of manufacturing.
Busbar and device layout
Heat load and ventilation
Labelling and cable-trunking plan
Kapsam
- Mechanical layout
- Heat-load calculation
- Labelling plan
Manufacturing with type-tested components
Manufacturing follows the approved design through cutting, assembly and wiring.
Each panel is recorded using in-process and final inspection forms.
Kapsam
- Sheet-metal processing and painting
- Busbar and wiring assembly
- In-process and final inspection
Delivery following factory acceptance testing
Before dispatch, the panel undergoes dielectric, earthing-continuity and functional tests.
Test results are shared with the customer; the customer may participate in factory acceptance testing on request.
Kapsam
- Dielectric test
- Earthing continuity
- Functional tests
Connections traceable on site
Cable preparation, termination and labelling are carried out against approved drawings. An orderly connection layout makes circuit tracing and maintenance easier.
Kapsam
- Terminal and cable connection plan
- Wire numbering and labelling
- Wiring inspections
- Current connection documentation
An organised handover package for operation and maintenance
Drawings, equipment information and inspection records defined in the project scope are assembled at panel handover. The document list is agreed against the customer specification and acceptance plan.
Kapsam
- Approved project and current drawings
- Equipment and material information
- Routine inspection and test records
- Operating and maintenance notes
Frequently Asked Questions:
Which standards are panels manufactured to?
Panels are designed and manufactured to the TS EN 61439 series. If the project requires another standard, such as a sector-specific specification, this is confirmed before manufacturing.
Do you provide type-test reports?
Type-test reports for the components used and panel-level routine test forms are included in the delivery package.
What is the panel manufacturing lead time?
The typical lead time is 4–8 weeks, depending on approved design and material procurement. A phased delivery plan may be arranged for urgent needs.
Can LV panels be manufactured to a project-specific design?
Yes. Panel dimensions, equipment layout, busbar arrangement, cable-entry directions and site conditions are determined by approved drawings and the technical specification.
Can a factory acceptance test (FAT) be performed?
FAT and customer participation can be planned according to the project acceptance plan and contract scope. Test scenarios and record formats are agreed before manufacturing.
What information is needed to request a panel-manufacturing quote?
If available, a single-line diagram, panel list, load and short-circuit data, dimensions, cable-entry directions, ambient conditions and technical specification support the preliminary review. Missing information is identified during the quotation process.