Software and Integration

Engineering Services

Software and Integration

Industrial Automation Software and Systems Integration

Bross Otomasyon develops PLC, HMI, and SCADA software for the operating scenarios of machinery and production lines. Before design begins, the process flow, sensor and actuator list, motor and drive information, operator needs, and existing control infrastructure are reviewed.

Control logic, safety interlocks, alarm levels, recipes, and user screens are defined with the operations team. Communication between the PLC, HMI, drives, and measurement devices is configured after supported protocols and project interfaces are verified.

Software tests are run against the defined scenarios. The scope of on-site commissioning, operator orientation, backups, and source files to be handed over is clarified according to project requirements.

Let's Discuss Your Automation Project
Industrial Control and Software Work at Bross Otomasyon Industrial Control and Software Work at Bross Otomasyon
Every field signal speaks the same language
Every field signal speaks the same language

Control layer

Every field signal speaks the same language

PLC and HMI programs follow the actual operating sequence of field equipment. Communication protocols are connected to one data model, so the higher-level system does not need to know the equipment brand.

  • PLC and HMI programming
  • Drive and communication integration
  • Functional safety (emergency stop, interlocking)
  • Field signal tests
Read production from the screen
Read production from the screen

Visibility

Read production from the screen

SCADA screens show operators the information they need to make decisions: line status, energy consumption, alarm history and shift reports. Archived data enables comparisons across periods.

  • SCADA and reporting screens
  • Energy monitoring and alarm management
  • Database and archiving
  • Remote access and authorisation

Control Layer

Software Is a Layer That Runs on Top of the Panel

PLC and HMI programs are written to match the actual operating sequence on site, and communication protocols are connected to a single data model. This means the higher-level system does not need to know the equipment brands, while operations staff can locate faults in the right place.

Tek veri modeli

Drives, meters, and analyzers from different brands are organized in the same tag structure; the SCADA layer operates without needing to know the equipment brand.

Okunabilir program

Function blocks are named using the facility's own terminology, so the maintenance team can read the program without outside support.

Archiving and Traceability

Alarms, measurements, and operator interventions are archived; shift and period comparisons can be reported.

How Does a Project Progress?

1

Sinyal listesi

Every field input and output is numbered with the operations team and linked to a single list.

2

Kontrol senaryosu

The operating sequence, safety interlocks, and alarm thresholds are documented as scenarios and approved.

3

Programlama ve test

The PLC and HMI are programmed, and each scenario is tested in simulation before field equipment is connected.

4

Commissioning and Training

The system is run with actual equipment, and the operator is trained in screen and alarm management.

Service Scope

  • PLC and HMI programming
  • SCADA and reporting
  • Drive and communications integration
  • Energy-monitoring software
  • Database and data archiving
  • Remote access and security

Continuous data from site to control room

Control software transfers data from field PLCs and remote I/O units to the SCADA layer.

  • Control scenarios and alarm management

  • Recipe and operator screens

  • User authorisation

Kapsam

  • PLC programming
  • SCADA screen design
  • Alarm and recipe management
Continuous data from site to control room

Measure and report consumption

Energy analysers and meters are brought together in a single monitoring layer.

Consumption, power quality and outage records can be reported.

Kapsam

  • Analysers and meter integration
  • Power-quality records
  • Consumption reports
Measure and report consumption

Communicates with higher-level systems

The monitoring layer communicates with ERP, maintenance management or enterprise data platforms through standard protocols.

This brings data together and reduces manual reporting.

Kapsam

  • OPC UA / Modbus / MQTT
  • Database and API integration
  • Report and dashboard publication
Communicates with higher-level systems

Defined interfaces for the control network

Communications among PLCs, HMIs, drives and higher-level systems are planned according to the project architecture. Network segmentation, user permissions, backup and remote access are determined with the customer's security requirements.

Kapsam

  • Communication protocol and network topology
  • Device and signal lists
  • Role-based access and backup approach
  • Definition of existing OT/IT interfaces
Defined interfaces for the control network

Scenarios verified and the operations team briefed

Control scenarios are first verified against an agreed test plan and then commissioned under site conditions. The operator and maintenance teams are briefed on screens, alarm management and basic intervention steps.

Kapsam

  • I/O and communications tests
  • Alarm and interlock scenarios
  • User acceptance and commissioning checks
  • Operator briefing and handover records
Scenarios verified and the operations team briefed

Frequently Asked Questions:

Will it work with our existing PLC infrastructure?

Integration is performed through the existing communication protocols, regardless of the brand and model at the facility. A phased transition plan is prepared if needed.

Is remote monitoring available?

Yes. Remote access to field data, alarm notifications and remote support can be provided through a VPN or secure publishing service.

How is data security handled?

The control network is separated from the corporate network, access is authorised by role, and interventions are recorded.

What information is needed for a PLC/SCADA project?

A machine or line flow diagram, I/O list, existing PLC/HMI model, communication protocols, alarm and user requirements, and technical specification help with preliminary work.

Can you establish communications with existing machines and higher-level systems?

Integration can be assessed where suitable protocols and interfaces are supported. The devices, network architecture and data exchange are verified with the parties to define scope and test method.

How are software changes and backups handed over?

Delivery of source files, backups, version information and operating notes is agreed under the project contract and licence terms; handover scope is decided at project start.

Otomasyon

Let's Discuss Your Automation and Monitoring Needs

Share your PLC/SCADA infrastructure, existing equipment, and reporting goals so we can plan the integration scope together.

PROJECT DISCUSSION

Let's review your project together.

Share your needs and contact information. Our team will get in touch to assess an engineering and manufacturing approach suited to your project.