Electrical and signalling work
Engineering aligned with the 225 km/h high-speed train project scope
Bross Otomasyon took an active role in electrical-distribution and signalling work for the TÜRASAŞ METS 225 km/h high-speed train project. Panel scope and site interfaces were addressed according to approved project documents and the technical requirements of the relevant parties.
- Review project documents and electrical needs
- Assess distribution and control panels against project interfaces
- Clarify site connection and integration requirements
- Track revisions and handover documents